Oracle Primavera Progress Apk

Oracle Primavera Progress Apk

Latest version 21.10.0
11 Feb 2023

Older Versions

Apk Infos

Version21.10.0
Rating4.2/5, based on 20 votes
Size‎5.2 MB
Requires AndroidAndroid 5.0+ (Lollipop)
Author's NotesStay up-to-date with project site updates ...

About Oracle Primavera Progress APK

Oracle Primavera Progress APK Download for Android
Oracle Primavera Progress APK Download for Android

Description

By installing this app you agree to the End User License Agreement terms at http://docs.oracle.com/cd/E84969_01/EULA/en/EULA.htm.

Use the Oracle Primavera Progress app to monitor and progress critical work assigned to you and your company. Stay up to date with project site updates and ensure the project team is familiar with the work you have completed. Oracle Primavera Progress provides offline access and the following capabilities:

• Provide on-site progress updates for your assigned work on projects, including tasks and activities.

• View and update issues assigned to you and your company.

• Use discussions to collaborate with peers on assigned work.

• View files related to your projects and save them for offline access.



Note: For full functionality, a current license and connection to Oracle Primavera Cloud are required. The app includes a demo mode that enables you to evaluate the app without a license or connection.

Latest updates

What's new in version 21.10.0

Minor bug fixes and changes to ensure a consistent and stable experience.

How to install Oracle Primavera Progress APK on Android phone or tablet?

Download Oracle Primavera Progress APK file from ApkClean, then follow these steps:

Update Phone Settings

  • Go to your phone Settings page
  • Tap Security or Applications (varies with device)
  • Check the Unknown Sources box
  • Confirm with OK

Go to Downloads

  • Open Downloads on your device by going to My Files or Files
  • Tap the APK file you downloaded (com.oracle.prime.progress-v21.10.0-ApkClean.apk)
  • Tap Install when prompted, the APK file you downloaded will be installed on your device.

Older Versions

21.10.0 (66)5.2 MB

Questions & Answers

Q: What is an APK File?

A: Just like Windows (PC) systems use an .exe file for installing software, Android does the same. An APK file is the file format used for installing software on the Android operating system.

Q: If I install an APK from this website, will I be able to update the app from the Play Store?

A: Yes, absolutely. The Play Store installs APKs it downloads from Google's servers, and sideloading from a site like ApkClean.net goes through a very similar process, except you're the one performing the downloading and initiating the installation (sideloading).
As soon as the Play Store finds a version of the app newer than the one you've sideloaded, it will commence an update.

Q: Why ApkClean.net can guarantee APK 100% safe?

A: Whenever someone wants to download an APK file from ApkClean.net, we'll check the corresponding APK file on Google Play and allow user download it directly (of course, we'll cache it on our server). If the APK file does not exist on Google Play, we'll search it in our cache.

Q: What are Android App permissions?

A: Apps require access to certain systems within your device. When you install an application, you are notified of all of the permissions required to run that application.

Don't hesitate to contact us if you have any questions or concerns.

(*) is required

User's Reivew

1 ★Shows NOTHING!! No activites, no tasks no nothing. Tried the projects app, at least I can mess with the lean scheduling but supposedly should be able to report issues, view schedule and more in this app, instead it's empty.
1 ★Not working properly