HyperXchange Order Photos Apk
Apk Infos
Version | 1.1 |
Rating | 4.0/5, based on 1 votes |
Size | 2.5 MB |
Requires Android | Android 5.0+ (Lollipop) |
Author's Notes | Its an app to take photos of item. |
About HyperXchange Order Photos APK
Table Of Contents
Description
This is an app used by the engineer for internal purpose only to take photos of the item before sending it to the customer.Latest updates
What's new in version 1.1
Fixed the issue where the app was crashing on startup.Now just open the app and the status will be checked if the video is present locally.
Added the feature to detect whether there is update available or not.
How to install HyperXchange Order Photos APK on Android phone or tablet?
Download HyperXchange Order Photos APK file from ApkClean, then follow these steps:
Update Phone Settings
- Go to your phone Settings page
- Tap Security or Applications (varies with device)
- Check the Unknown Sources box
- Confirm with OK
Go to Downloads
- Open Downloads on your device by going to My Files or Files
- Tap the APK file you downloaded (com.hyperxchange.pronoymukherjee.orderphotos-v1.1-ApkClean.apk)
- Tap Install when prompted, the APK file you downloaded will be installed on your device.
Older Versions
1.1 (2) | 2.5 MB |
Questions & Answers
Q: What is an APK File?
A: Just like Windows (PC) systems use an .exe file for installing software, Android does the same. An APK file is the file format used for installing software on the Android operating system.
Q: If I install an APK from this website, will I be able to update the app from the Play Store?
A: Yes, absolutely. The Play Store installs APKs it downloads from Google's servers, and sideloading from a site like ApkClean.net goes through a very similar process, except you're the one performing the downloading and initiating the installation (sideloading).
As soon as the Play Store finds a version of the app newer than the one you've sideloaded, it will commence an update.
Q: Why ApkClean.net can guarantee APK 100% safe?
A: Whenever someone wants to download an APK file from ApkClean.net, we'll check the corresponding APK file on Google Play and allow user download it directly (of course, we'll cache it on our server). If the APK file does not exist on Google Play, we'll search it in our cache.
Q: What are Android App permissions?
A: Apps require access to certain systems within your device. When you install an application, you are notified of all of the permissions required to run that application.
Don't hesitate to contact us if you have any questions or concerns.
(*) is required