Crunchtime Impact Apk

Crunchtime Impact Apk

Latest version 2.10.0
01 Dec 2023

Older Versions

Apk Infos

Version2.10.0
Rating2.6/5, based on 40 votes
Size‎39.7 MB
Requires AndroidAndroid 8.0+ (Oreo)
Author's NotesMonitor sales. Track food and labor costs. See Guest and Check counts, and more!

About Crunchtime Impact APK

Crunchtime Impact APK Download for Android
Crunchtime Impact APK Download for Android

Description

Monitor restaurant sales, food and labor costs, guest counts, labor costs, and so much more. Track real-time performance from the consolidated brand level down to each location. Quickly detect high-achievers and under-performers.

Configure push notifications for upcoming or overdue restaurant tasks - and now you can navigate directly to Counter or Reconciler to complete them! Just enter your Crunchtime Net-Chef™ URL on the app’s configuration screen and get right to work using your existing Net-Chef credentials.

NOTE: This app is intended for use with the Crunchtime core suite and requires additional licensing. Support is dependent on the use of the most recent mobile app version. Specific features and functions within the app may not be enabled at the administrator's discretion. Please contact your Crunchtime administrator with any questions.

Latest updates

What's new in version 2.10.0

- Refreshed look, feel, & logos
- Various bug fixes & performance improvements

How to install Crunchtime Impact APK on Android phone or tablet?

Download Crunchtime Impact APK file from ApkClean, then follow these steps:

Update Phone Settings

  • Go to your phone Settings page
  • Tap Security or Applications (varies with device)
  • Check the Unknown Sources box
  • Confirm with OK

Go to Downloads

  • Open Downloads on your device by going to My Files or Files
  • Tap the APK file you downloaded (com.crunchtime.Impact.Android-v2.10.0-ApkClean.apk)
  • Tap Install when prompted, the APK file you downloaded will be installed on your device.

Older Versions

2.10.0 (210000894)39.7 MB
2.9.2 (29200042)40 MB

Questions & Answers

Q: What is an APK File?

A: Just like Windows (PC) systems use an .exe file for installing software, Android does the same. An APK file is the file format used for installing software on the Android operating system.

Q: If I install an APK from this website, will I be able to update the app from the Play Store?

A: Yes, absolutely. The Play Store installs APKs it downloads from Google's servers, and sideloading from a site like ApkClean.net goes through a very similar process, except you're the one performing the downloading and initiating the installation (sideloading).
As soon as the Play Store finds a version of the app newer than the one you've sideloaded, it will commence an update.

Q: Why ApkClean.net can guarantee APK 100% safe?

A: Whenever someone wants to download an APK file from ApkClean.net, we'll check the corresponding APK file on Google Play and allow user download it directly (of course, we'll cache it on our server). If the APK file does not exist on Google Play, we'll search it in our cache.

Q: What are Android App permissions?

A: Apps require access to certain systems within your device. When you install an application, you are notified of all of the permissions required to run that application.

Don't hesitate to contact us if you have any questions or concerns.

(*) is required

User's Reivew

1 ★I will not open for me
1 ★I hate work
1 ★Keep trying to sign in and it says server unavailable. Is this something my company needs to purchase?
1 ★Not working even Uninstalled and reinstalled
5 ★For quick real time info it serves it's purpose well.
5 ★Love the app just wish it would do hourly update faster!
1 ★Was working fine then it stopped loading. I uninstall then reinstall it and still will not open. Restarted myphone and still nothing. The other netchef apps seem fine so far.
1 ★Crashes every time it opens
1 ★Won't even open...horrible app.
1 ★Crashed all the time. I have to uninstall and reinstall all the time