PRO PMP PMBOK6 EARNED VALUE ANALYSIS PMSUGURU Apk

PRO PMP PMBOK6 EARNED VALUE ANALYSIS PMSUGURU Apk

Latest version 4.0
24 Mar 2018

Older Versions

Apk Infos

Version4.0
Rating5.0/5, based on 1 votes
Size‎1.7 MB
Requires AndroidAndroid 2.3+ (Gingerbread)
Author's NotesThe best tool app for learning PMP Earned Value Analysis Practically

About PRO PMP PMBOK6 EARNED VALUE ANALYSIS PMSUGURU APK

PRO PMP PMBOK6 EARNED VALUE ANALYSIS PMSUGURU APK Download for Android
PRO PMP PMBOK6 EARNED VALUE ANALYSIS PMSUGURU APK Download for Android

Description

The best tool app for learning PMP Earned Value Analysis Practically
Covered all the PMP PMBOK6 Earned Value Analysis Subject Matters

PV
EV
AC
BAC
CV
SV
VAC
CPI
SPI
EAC
ETC
TCPI

Latest updates

What's new in version 4.0

Release 4.0 Notes: Disabled multiple notifications. Enhanced the content and navigation. Enabled back button navigation. Enhanced description and made more explanatory.

Great Earned value analysis learning tool aligned to PMP PMBOK6 preparation. Use anywhere just enter the input values and learn from detailed explanation covered in the app.

Coverage:

PMP PMBOK6 Earned Value Analysis

PV
EV
AC
BAC
CV
SV
VAC
CPI
SPI
EAC
ETC
TCPI

How to install PRO PMP PMBOK6 EARNED VALUE ANALYSIS PMSUGURU APK on Android phone or tablet?

Download PRO PMP PMBOK6 EARNED VALUE ANALYSIS PMSUGURU APK file from ApkClean, then follow these steps:

Update Phone Settings

  • Go to your phone Settings page
  • Tap Security or Applications (varies with device)
  • Check the Unknown Sources box
  • Confirm with OK

Go to Downloads

  • Open Downloads on your device by going to My Files or Files
  • Tap the APK file you downloaded (com.rajeshsuguru.proearnedvalueanalysispmsuguru-v4.0-ApkClean.apk)
  • Tap Install when prompted, the APK file you downloaded will be installed on your device.

Older Versions

4.0 (1)1.7 MB

Questions & Answers

Q: What is an APK File?

A: Just like Windows (PC) systems use an .exe file for installing software, Android does the same. An APK file is the file format used for installing software on the Android operating system.

Q: If I install an APK from this website, will I be able to update the app from the Play Store?

A: Yes, absolutely. The Play Store installs APKs it downloads from Google's servers, and sideloading from a site like ApkClean.net goes through a very similar process, except you're the one performing the downloading and initiating the installation (sideloading).
As soon as the Play Store finds a version of the app newer than the one you've sideloaded, it will commence an update.

Q: Why ApkClean.net can guarantee APK 100% safe?

A: Whenever someone wants to download an APK file from ApkClean.net, we'll check the corresponding APK file on Google Play and allow user download it directly (of course, we'll cache it on our server). If the APK file does not exist on Google Play, we'll search it in our cache.

Q: What are Android App permissions?

A: Apps require access to certain systems within your device. When you install an application, you are notified of all of the permissions required to run that application.

Don't hesitate to contact us if you have any questions or concerns.

(*) is required